VOKERA Linea Especificações Página 5

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 12
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 4
4
Linea
2.1 BEFORE SWITCHING ON
Before switching the appliance on please famil-
iarise yourself with:
How to isolate the appliance from the gas, wa-
ter, and electricity supplies.
How to check and top-up – if necessary – the
system water pressure.
The time clock or boiler control.
Any external thermostats and their functions.
The appliance controls.
2.2 APPLIANCE CONTROLS (see fig. 1)
The appliance controls are concealed behind the
front flap. To gain access to the controls simply
press the top centre of the flap, release, and pull
downwards.
The appliance has a mode selector switch, vari-
able thermostats for controlling the temperature
of the heating flow outlet and the hot water outlet,
system pressure gauge, and an aperture for an
integral clock. The mode selector switch has three
positions:
Hot water only
Off
Heating & hot water
The variable hot water thermostat allows you to
set the temperature of the water to your hot wa-
ter taps between 37.5°C (min) and 65°C (max).
The appliance will have been commissioned by
your installer to deliver hot water at both a rea-
sonable temperature and flow rate.
Should you wish to increase the temperature of
the hot water and the hot water thermostat is al-
ready set at maximum, simply reduce the flow of
water as it comes out of the tap. Please consult
your installer for further advice if required.
The variable heating thermostat allows you to set
the temperature of the water to your radiators be-
tween 40°C (min) and 80°C (max).
The pressure gauge shows the current pressure
of the system, the gauge should be set between
1 and 1.5 BAR. When the appliance is operating
the gauge may rise or fall slightly, this is quite
normal. The minimum permissible level for the
safe and efficient operation of the appliance is
0.5 BAR. Should the pressure fall below 0.5 BAR,
the boiler shuts off automatically.
Depending on the type of controls specified by
your installer you may have an integral Vokera
time clock or the Vokera remote control fitted, if
so, supplementary instructions can be found at
the back of this booklet. If an external time clock
has been fitted, please refer to the instructions
supplied with such.
2.3 LIGHTING THE BOILER
Ensure the gas and electrical supplies to the boiler
are turned on.
Turn the mode switch to the ‘heating & hot water’
position. The status indicator should be ‘Green’ if
the status indicator is flashing ‘Red’ refer to 3.2.
Refer to the particular instructions for the type of
time clock or control fitted and ensure there is a
demand for heating. If there is a room thermostat
you should ensure that this is also calling for heat.
When there is a demand for heating via the above
controls the boiler will go through an ignition se-
quence, whereby the burner will light.
If the appliance fails to ignite during the ignition
sequence, allow a period of two minutes before
re-setting.
To adjust the output temperature of the appliance
turn the thermostat knob clockwise to increase
or anti-clockwise to decrease.
When the appliance reaches the set tempera-
ture, the burner will go off for minimum period of
approximately 3 minutes.
When the time clock or external thermostats heat-
ing request has been satisfied, the appliance will
switch off automatically.
When the mode selector switch is in the hot wa-
ter only or heating & hot water position, the boiler
will light to supply hot water whenever a hot wa-
ter outlet (tap) is opened.
Periodically the appliance will light on minimum
output as a function of the pre-heat facility.
Fig. 3
Normal
Operating
Position
Filling
Position
Closed
Position
1.9 FILLING VALVE
The filling valve is located underneath the boiler.
The filling valve lever has 3 positions:
Normal operating position.
Closed position.
Filling position
The valve lever should never be turned to the fill-
ing position unless the filling loop has been con-
nected and the system pressure requires topping-
up (see 3.1).
GETTING STARTED
Vista de página 4
1 2 3 4 5 6 7 8 9 10 11 12

Comentários a estes Manuais

Sem comentários